1 | Tube plate exposed for
MPI Analysis
2 | Tubes identified following MPI Analysis awaiting replacement
3 | Tube cracks identified using
MPI Analysis
4 | Tube cracks identified from
MPI Analysis
We were engaged by one of our regular clients to carry out their annual GN3 Boiler strip, valve overhaul and tube plate survey, this identified weld cracks on the boiler tube to tube plate location which necessitated removal of several boiler tubes. Where indicated the damaged tubes were removed from the tube plate, J preps were carried
out to facilitate the new replacement tubes which were then welded back positionally into the boiler tube plate. Further MPI Analysis proved the integrity of the welds to the satisfaction of the insurance inspecting engineer and the boiler was rebuilt for production.
Telephone +44 (0) 1384 564160
FAX +44 (0) 1384 635628 72 Bannister Street, Cradley Heath, Warley, B64 5EQ
© Industrial Combustion Engineers Ltd. 2023.
Website design by Steve Jolliffe
Telephone +44 (0) 1384 564160
FAX +44 (0) 1384 635628
72 Bannister Street, Cradley Heath, Warley, B64 5EQ
© Industrial Combustion Engineers Ltd. 2018.
Website design by Steve Jolliffe